3 保证安全的组织措施(3. Ensure the safety of the organization).docVIP

3 保证安全的组织措施(3. Ensure the safety of the organization).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
3 保证安全的组织措施(3. Ensure the safety of the organization)

3 保证安全的组织措施(3. Ensure the safety of the organization) 3. Ensure the safety of the organization Work on electrical equipment to ensure safe organizing measures. 3.1.1 working ticket system. Work permit system. 3.1.3 work guardianship system. 3.1.4 job interruption, transfer and termination. 3.2 working ticket system. 3.2.1 work on the electrical equipment shall be filled with the work ticket or accident emergency repair list, in which there are six types of: 3.2.1.1 fill out the first work ticket of substation (power plant) (see appendix B). 3.2.1.2 fill in the first working ticket of power cable (see appendix C). 3.2.1.3 fill in the second duty ticket of substation (power plant) (see appendix D). 3.2.1.4 fill in the second duty ticket of power cable (see appendix E). 3.2.1.5 to fill the working ticket (see appendix F) for the charged operation of the substation (power plant). 3.2.1.6 the emergency repair list for the accident of the substation (power plant) is filled (see appendix G). 3.2.2 the work of filling the first working ticket is: 3.2.2.1 the work on the high voltage equipment requires all the power failure or partial blackouts. 3.2.2.2 work on the road back to the road, such as secondary system and lighting, requires the power failure of the high-voltage equipment or the safety measures. 3.2.2.3 the work of power failure of high voltage power cable. 3.2.2.4 converter transformer, dc field equipment and valve hall equipment need to stop the high-voltage dc system or dc filter. 3.2.2.5 the work of dc protective device, channel and control system needs to be stopped by the high-voltage dc system. 3.2.2.6 valve cooling system, valve hall air conditioning system, fire alarm system and image monitoring system are required to stop the high-voltage dc system. 3.2.2.7 other work requires the power failure of the high-voltage equipment or the safety measures. 3.2.3 the work of filling the second working ticket is: 3.2.3.1 control panel and low-voltage switchboard, di

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档