挖孔桩施工组织(Excavation pile construction organization).docVIP

挖孔桩施工组织(Excavation pile construction organization).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
挖孔桩施工组织(Excavation pile construction organization)

挖孔桩施工组织(Excavation pile construction organization) Construction scheme of artificial excavation pile I. project overview This is a self-describing Ii. Engineering geology and hydrogeological conditions This is on the geological report Ii. Construction preparation: 2.1 materials and main equipment: 2.1.1 cement: ordinary Portland cement, no. 325 ~ 425 2.1.2 sand: local sand, not more than 5%. 2.1.3 stone: the diameter of the protective wall is 0.5 ~ 1.5 cm. The pile core concrete USES a particle size of 2 ~ 3cm gravel. 2.1.4 water: drinking tap water. 2.1.5 the early strength agent shall be selected through the test, and the fly ash admixture shall be determined according to the rules of the laboratory. 2.1.6 reinforcement: the level and diameter of the steel bar conforms to the design requirements, and there are the factory certificate and the retry report. 2.1.7 shall generally be equipped with mark up, the hoist group or electric hoist, trolley or skip, picks, spade, shovel, brazing, line drop, the fixed pulley group, guide pulley block, concrete mixer, bucket, chute, catheter, vibration rods, brazing, coarse hemp rope, wire rope, safety activities cover plate, waterproof lights (low voltage 36 v, 100 w), electric welding machine, ventilation and oxygen equipment, lift pump, 60 concrete pump, wood jigger, gym, helmets, belts, etc. 2.1.8 template: combined steel mould, curved tool type four (or eight) assembly. Fixtures, hooks and spare parts. Wood, wood, etc. 2.2 operating conditions: 2.2.1 excavated pile-hole, the wall support shall be conducted according to the characteristics of the soil quality and the distribution of ground water according to the geological survey report, and the reasonable division of labor and special attention should be made. 2.2.2 before excavation, the site should be completed and completed. The ground, underground cable, pipeline, old buildings, equipment foundation and other obstacles have been eliminated. Temporary facilities such as

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档