地形测量技术设计(Design of topographic surveying technology).docVIP

地形测量技术设计(Design of topographic surveying technology).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地形测量技术设计(Design of topographic surveying technology)

地形测量技术设计(Design of topographic surveying technology) This post will be edited by huangzhaoy at the end of 2012 Design of topographic surveying technology Chapter 1 overview The purpose and task of topographic survey To meet ACheng hongxing reservoir planning management and the need of engineering construction, in order to a high starting point, high standard to prepare hongxing reservoir development and construction planning, expand the area of about 10 km2 in the latter topography measurement. The department of surveying and mapping engineering of heilongjiang university of engineering is planning to complete the work of both internal and external industries in June 2006 if undertaking this task. The main tasks of this survey are: 1. The use of advanced GPS (global positioning system (GPS) measurement technology, establish basic e-class GPS control network, hongxing reservoir construction planning, and for the future of the planning and construction to provide reliable measurement control points. Control area about 12km2. 2. On the basis of the e-class GPS network, the scope of the surveyed area and ophiolites in duolie, traverse control network layout level, for the topographic survey and the topographic map update construction lofting measurement and to provide enough to count the data. 3. Using the computer-aided mapping technique of whole field data collection, the map of 1:1000 scale topographic map is about 10km2 to form a complete and accurate data file of topographic map. 4. Provide a map of 1:100 topographic map of the area with a height of 1m and a 1:20 topographic map. Profile measurement area ACheng hongxing reservoir 42 km away from Harbin, in the center part of the surveyed area east longitude 127 ° 08 north latitude 45 ° 34 surveyed area is located in xiao xing guang-cai zhang gain ridge -odd arteries, mountainous, mountain ranges, a thin north reed groove in the north part of the surveyed area, south to hongxing commune homes, west Yao Gutun, east t

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档