- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
玻璃幕墙的施工方案及施工工艺(国外英文资料)
玻璃幕墙的施工方案及施工工艺(国外英文资料) Construction scheme and construction technology of glass curtain wall Recommended answer 1. basic requirements (1) working conditions; 1) the curtain wall construction organization shall be designed, and the construction shall be carried out in strict accordance with the order of the construction organization design. 2) curtain wall should be started after the main structure is completed. As for the curtain wall of high-rise building, because of the time limit, the construction of the curtain wall should be carried out along the high section under the premise of guaranteeing the quality and safety. When the curtain wall is crossed with the upper main structure, reliable protective measures must be taken at the top of the structure and below the curtain wall. 3) curtain wall construction, the original structure of the main construction of the external scaffolding should be retained, and in accordance with the requirements of the curtain wall construction of the necessary changes (the scaffold from the main structure of the body is not less than 300mm). If the curtain wall is installed with a basket, the basket must be safe and reliable 4) the curtain wall construction shall be equipped with necessary safe and reliable lifting tools and equipment. 5) when the decoration project will cause pollution or damage to the curtain wall, the project should be arranged before the curtain wall construction, or should take reliable measures to protect the curtain wall. 6) the curtain wall construction should not be carried out under heavy wind and heavy rain. When the temperature is lower than -5 degrees, glass installation shall not be carried out, and sealant construction should not be carried out in rainy days. 7) should be controlled in the construction of the main structure and check fixed curtain wall on each floor (roof) surface elevation, line size and position deviation of embedded parts and curtain wall construction, before the deal with the insp
您可能关注的文档
最近下载
- 心理卫生与心理咨询填空题.doc VIP
- 2023高考英语复习之高频词长难句练习2 全国乙卷七选五(解析版).pdf VIP
- 【高中化学】13个知识点的易错集锦.pdf VIP
- 现场签证单表格.docx VIP
- 中央财经大学后勤处、后勤服务产业集团 全员聘用管理暂行办法.doc VIP
- 2025中央财经大学后勤服务产业集团工程管理岗招聘1人(非事业编制)笔试备考试题及答案解析.docx VIP
- 必威体育精装版国家开放大学国开电大《离散数学》形考任务+大作业答案.pdf VIP
- 现场签证单表格优质资料.doc VIP
- 24J331地沟及盖板参考图集.docx
- 汽车维修清单表(含使用说明).docx VIP
文档评论(0)