- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
玻璃幕墙施工工艺及技术方案(国外英文资料)
玻璃幕墙施工工艺及技术方案(国外英文资料) Construction technology and technical scheme of glass curtain wall 1 、 installation process and technical scheme of connector Curtain wall component site construction methods and technical measures are as follows: annex two, glass and aluminum curtain wall installation work instruction 1.1 process description: Process: familiar with the drawings and technical disclosure. Familiar with the construction site: find the embedded iron parts, align the vertical beam line, pull the horizontal line, control the horizontal height and the deep position. 1.2 basic operation instructions: 1.2.1 familiar with drawings: understand changes, changes and design changes in previous processes. 1.2.2 familiar with the construction site: the construction site of the familiar, including two aspects, first, the quality of the construction process acceptance; two is the control drawing requirements for the next work arrangements. 1.2.3 to find the embedded iron parts: the role of embedded iron pieces is to fix the connecting parts so as to connect the curtain wall structure with the main concrete structure. The connecting piece is arranged at first to find the original embedded parts, only seek to associate the embedded parts very accurately install connectors. 1.2.4 control vertical beam vertical: the center line of the vertical beam is also the central line of the connecting piece, so it is necessary to pay attention to the position of the connecting piece during installation, and the deviation is less than 2mm. 1.2.5 pull horizontal control level and depth dimension. Although the control level to the buried iron piece, but due to the influence of construction error, installation and connection pieces still need to control the level and depth of the line of pull connector installation to ensure accurate methods according to previous process operating requirements. 1.2.6 spot welding: after the connecting parts are located in the three-dimensional space, the temporar
文档评论(0)