玻璃幕墙施工技术与误差控制探讨(国外英文资料).docVIP

玻璃幕墙施工技术与误差控制探讨(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
玻璃幕墙施工技术与误差控制探讨(国外英文资料)

玻璃幕墙施工技术与误差控制探讨(国外英文资料) Discussion on construction technology and error control of glass curtain wall Release time: 2013-11-15 11:05:32 Abstract: in this paper, the author discusses the construction technology and error control of glass curtain wall with reference to engineering examples for reference. Key words: glass curtain wall; construction technology; error control I. Preface The glass curtain wall as the periphery structure of the building, with the formation of architectural art, architectural space, comfortable environment, convenient living, saving social resources, excellent performance and avoid the lightning fires and other natural disasters. Glass curtain wall is loved by many designers. It has been widely used by designers to decorate many kinds of buildings. The installation and construction process of glass curtain wall is the carrier of deepening design, improving process flow, process operation and quality control. Its construction process is various, only strict control and inspection, in order to ensure the quality of the project. Combining with engineering example, the author discusses the construction technique and error control of glass curtain wall for reference by colleagues. Two. General situation of Engineering G38 commercial building has 26 floors, with a height of 80m and a construction area of 24390 m2. It is made up of vertical and horizontal hidden glass curtain wall and full hidden frame glass curtain wall. The curtain wall glass adopts 6+12a+6mm sunshade Low-E glass, and has good heat insulation performance. Curtain wall node diagram: Fig. 1 horizontal joint of glass curtain wall 2 glass curtain wall cross section node Three, construction technology Construction process of glass curtain wall The measurement line, to support installation, installation of embedded parts column positioning line, connector installation, installation, installation of column fireproof partition board, fireproof cotton or cotton insulation installation, i

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档