- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
平法施工图的看图要点(国外英文资料)
平法施工图的看图要点(国外英文资料)
Flat picture point method of construction drawing 2008-04-06 00:48. Look at the points of working drawings generated by the
Look at the contents of the structural design instructions; for example, remember the seismic grade of each component, the strength grade of the concrete, etc.
See the main points:
1 according to the corresponding floor plan, proofread the axis, the axis number and the axis size;
2, according to the corresponding building floor plan room partition, wall column layout, check the beam layout is reasonable, beam axis positioning size is complete and correct.
3 carefully check the number of each beam, span, section size, reinforcement, stirrups, and relative elevation. First, the girder or sub beam is distinguished according to the support condition and span number of the beam, and the cross number is checked correctly;
The same problem must be encrypted for the beams and joints
And the spacing is not 100, but 5D
The reinforcement of the connection area of longitudinal reinforcement is independent of seismic and aseismic
4, if the main beam, check additional lateral reinforcement are missing, cross section size, beam elevation, meet the secondary beam support requirements.
5 check the beam section size and beam relative elevation and building hole size, roof elevation, etc. there is no contradiction between node detail.
Check the concentration of labeled upper beam reinforced with in situ reinforced mark long without contradiction;
6 check the focus marking upper beam reinforcement and reinforced in situ labeling usually has no contradiction; often ask some drawings are not labeled what some beam
8 check the stair platform beam and the platform plate whether there is no support
This is a common design problem
Stair platform beams and platform plates without bearings are a common design problem
Because the stair beam and platform board are usually placed behind the wall
In the construction of the subject requires personnel up and
您可能关注的文档
最近下载
- 型钢悬挑卸料平台监理实施细则.doc VIP
- 2025版必威体育精装版建设工程强制性条文汇编.pdf VIP
- (高清版)DG∕TJ 08-2105-2022 行道树栽植与养护技术标准.pdf VIP
- 无人机组装与调试:多旋翼无人机飞控系统组装调试PPT教学课件.pptx VIP
- 检验检测机构资质认定质量手册和程序文件(质量记录表格汇编).doc VIP
- 建筑机电安装培训.pptx VIP
- 初三物理课件第十六章 3节 电阻课件初三物理课件第十六章 第3节 电阻课件.ppt VIP
- 低空经济产业园招商引资与项目管理.docx VIP
- 燃气经营安全重大隐患判定标准课件.pptx VIP
- 2025年学校基孔肯雅热防控工作预案(精选模板).docx
文档评论(0)