- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大模板施工(国外英文资料)
大模板施工(国外英文资料)
Construction technology of large formwork
The process standard is mainly applicable to the installation and removal of large formwork for industrial and civil building, internal formwork, outer brick, internal mold and full cast in place shear wall structure.
2.1 materials and main equipment:
2.1.1 matching template: flat die, die angle, including anchor bolts and plates, wall bolt and sleeve body bar, ladder and platform plate etc..
2.1.2 isolation agent: methyl silicone resin, water-based release agent.
2.1.3 should have a hammer, axe, drill, drill, a monkey wrench. The level of scale, line sinkers, crowbar, hoisting rigging etc..
2.2 operating conditions:
2.2.1 design the formwork according to the engineering structure design to ensure the strength, rigidity and stability.
2.2.2 play the wall, line, door and window, location line and elevation line of the floor.
Reinforced wall body 2.2.3 banding is completed, hydropower box, embedded parts, doors and windows embedded is completed, check the thickness of protection layer should meet the requirements, through covert project acceptance procedures.
2.2.4 in order to prevent the big template mouth running slurry, installation of large template before good mortar leveling layer, but leveling layer can not extend into the wall.
2.2.5 outside brick internal model structure, before installing the large template, the composite column at the wall of the tongue ash clean up, all the cast-in-place structure hanging for external wall template operation shelf.
2.2.6 before installing the large template, the large template should be cleaned up, and brush off the isolation agent (not allowed in the template after the brush isolation agent, to prevent contamination of steel and concrete contact surface, brushing evenly, shall not leak brush).
3.1 outer plate internal mold structure installation large template:
3.1.1 process flow:
Ready to work to an external wall panel, installation template, plus an anti - number