广厦结构常用语(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
广厦结构常用语(国外英文资料)

广厦结构常用语(国外英文资料) [frequently used words] Explain: Supplementary notes: The plate thickness not specified is 100mm The grade of concrete is C25 No marked plate top elevation is 2.910 The%%p0.000 elevation of this building is equivalent to the absolute elevation 12.340m The components shown in this drawing are all C25 grade concrete pouring For frames with KZ1~KZ20 reinforcement, see twentieth sheets For shear walls and concealed columns, see tenth sheets Column ZJ-1~ZJ-20 plane position. Twentieth For the KZ1~KZ20 position of the frame column, see twentieth Details of the frame joints and reinforcement are shown in twentieth sheets See tenth for specific notes See the general plan of this project The dimensions of the works are in millimeters, the elevation is relative elevation, and the units are meters Except for those marked, the beam reinforcement shall be%%1308@100/200 Double layer bidirectional Parapet practice see building plans Trench cover Perimeter arrangement Seam reinforcement Indoor ground Anchor entry column 40d Drain pipe D=50 Plate top elevation The foundation design of the building falls on the pebble bed Such as the buried depth of the foundation failed to reach the design bearing layer The building is designed according to fk=120kpa, and the groove is fulfilled after foundation pit excavation If the bearing capacity of the foundation does not meet the design requirements, the basic design shall be revised The main bars of some constructional columns are used as lightning protection and lead wires, and the construction should be coordinated with electrical engineering The foundation must be on the designed bearing layer, and the over excavation part shall be backfilled with graded sand and gravel Concrete mark: Foundation: C15 concrete wall and ground beam: C20 Indoor trench practices are using the 86J334 Atlas 20 thick 1:2.5 cement mortar (seepage 3% waterproof agent) 4 thick polyester tire modified asphalt felt C50 light steel keel 10 thick cement

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档