- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
质料员试题1(国外英文资料)
质料员试题1(国外英文资料) The clerk reviewed the data 1, what are the construction works sub branch? Which segments are included in the civil works? What branches does the building equipment project contain? 1) construction project has nine divisions: engineering foundation and foundation engineering, the main structure, building decoration, building level, building water supply, drainage and heating engineering, electrical engineering, ventilation and air conditioning engineering, elevator installation engineering, intelligent building; 2) the civil works include the following parts: foundation and foundation engineering, main structure, building decoration and construction level; 3) construction equipment engineering consists of construction, water supply, drainage and heating works, building electrical engineering, ventilation and air conditioning works, elevator installation works, intelligent buildings 2, engineering quality control data is divided into what kinds? 1) acceptance data 2) construction technology management information 3) product quality certificate 4) inspection report 5) construction record 6) inspection report 3, the completion of acceptance documents what? 4. The minimum warranty period for housing construction is: 1) the ground foundation works and the main structural works, for the design document specified the reasonable use of the project limit. 2) roof waterproof works, waterproof requirements of bathrooms, rooms and walls of the seepage prevention, for 5 years. 3) heating and cooling systems are 2 heating and cooling periods. 4) the installation of electric pipelines, water supply and drainage pipelines and equipment is 2 years. 5) renovation project for 2 years. 6) the warranty period for other projects shall be agreed upon by the construction units and the construction units. 7) curtain wall works for 3 years. 5, the requirements of the intermediate acceptance division (sub branch) project which? 1) pile foundation, natural foundation, foundation
您可能关注的文档
最近下载
- 大学东南大学vlsi设计基础数字集成电路_2016vlsi1-课程介绍for mooc.pdf VIP
- 医美网络咨询与沟通(医美咨询师课件).pptx
- 2025中国华电集团有限公司校招+社招笔试参考题库附带答案详解.docx
- 【打印】人教版小学3-6年级英语词汇表.pdf VIP
- 液化气体钢瓶充装前后检查及充装记录.docx VIP
- 2025年高考数学新定义题型:集合下的新定义(四大题型)学生版+解析.pdf VIP
- 科室医疗质量自查工作制度.docx VIP
- 江苏省2017届九年级化学下学期第二次模拟试题.pdf VIP
- 广州市公务车维修项目工时费明细表.pdf VIP
- 内蒙古自治区点石联考2026届高三上学期9月份联合考试政治试卷(含答案).docx VIP
文档评论(0)