安全员C证考试试题(国外英文资料).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安全员C证考试试题(国外英文资料)

安全员C证考试试题(国外英文资料) Security officer C card exam questions browse times: 1078 Update Date: 2011-4-8 15:33:14 radio questions: The excavation of 1. wetland areas, for artificial precipitation, fell to the bottom (0.5 to 1 meters) shall be excavated. 2. when excavating in expansive soil area, do well (drainage work) before excavation. 3., the use of reinforced concrete pouring pile, the excavation standard is pile concrete reach (design strength). 4. when the earthwork is excavated, the spacing between the two persons shall be maintained (1 meters). 5. the head of the shield machine should check the concentration of combustible gas every day, so as to predict, prevent and control the work, and do a good job (record book). 6. the drainage ditch and the water collection well around the foundation pit (trough) shall be located outside of the foundation. 7. the tool shall be well insulated and shall be operated with an electric high pressure oil pump (insulated gloves). 8., the excavated cars should be guided and guided, strictly prohibited (overload). 9. jacking method jacking length more than (50 meters), there should be measures to prevent hypoxia and suffocation. 10. pipe jacking construction. Pit oxygen and acetylene bottles (not allowed into the pit) placed. 11. the lighting and telecommunication system in the pipeline is generally used (low voltage electricity). 12. the installation of support must be built according to the order of (slotted support, pre support and dig). The dismantling of the 13. support shall be carried out according to the order in which the support is removed. 14. the reference points shall not be less than 2. 15. the formwork and its support must be set up during the installation (temporary fixing equipment capable of preventing overturn). 16., the template installation must be set up, the minimum height of the operation platform is (2 meters). 17. fastener type steel pipe support is higher than (4 meters) horizontal scissors support. 18., in t

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档