大工14春《建筑施工》在线测试1~3答案(国外英文资料).doc

大工14春《建筑施工》在线测试1~3答案(国外英文资料).doc

  1. 1、本文档共45页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大工14春《建筑施工》在线测试1~3答案(国外英文资料)

大工14春《建筑施工》在线测试1~3答案(国外英文资料) Big work 14 spring building construction online test 1 First, radio questions (20 questions, 60 points) V 1. of the following soil materials, may be used as filling is (). A. sludge B. expansive soil C. silty clay with an organic content of 10% D. water soluble sulfate is 3% sand The correct answer: D full marks: 3 points 2., in order to ensure the safety and effectiveness of the foundation pit construction, the distance between the recharging well point and the precipitation well point should be maintained, and the precipitation and recharge should be synchronized. A. is greater than 6m B. is less than 6m C. is greater than 5m D. is less than 5m The correct answer: B full marks: 3 points 3. dry density after filling should be more than (above) in line with the design requirements, and the remaining () the minimum value and design value of the difference may not be greater than 0.08g/mm3, and should be dispersed, not concentrated. A. 90%, 10% B. 80%, 20% C. 70%, 30% D. 60%, 40% The correct answer: A full marks: 3 points The vertical deviation of 4. precast piles shall be controlled by (). Within A. 3% Within B. 2% Within C. 1.5% Within D. 1% The correct answer: D full marks: 3 points 5. deep well points can generally reduce the water level () M. A. 10~20 B. 20~30 C. 30~40 D. 40~50 The correct answer: C full marks: 3 points 6. feet high brick foundation generally uses a form of a smooth masonry, the top bricks on foot and a wall under the skin (moisture layer below a piece of brick) should be (). A. progressive brick B. one by one C. plum flower D. Ding brick The correct answer: D full marks: 3 points 7. the following statement about the excavation of the foundation pit is wrong. A. foundation pit corners can be manually combined with clear slope B. period of construction, the construction of large machinery pit should be paved for steel plate or the base box pad road paving C. mechanical excavation shall be shallow and deep D. for some s

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档