Bridge construction
There are 1 bridges in this section, that is, the rock bridge, the center post No. K110+268, is a span of 30 meters of T beam structure, the bridge length of 156 meters. The upper bridge is simply supported to continuous prestressed T beam, the lower beam, column, beam, floor, bored pile foundation. Project number: T beam 60, pile 32, 12 beam, 16 columns.
Drilling data show that the soil under the riverbed is sandy soil and gravel soil, and the bedrock is weakly weathered shale.
Set the bridge in the left of the line.
The main construction schedule is from January 1, 2003 to April 1, 2004.
(1) construction of bored piles;
The contract section has 32 bored piles, and the diameter is 180cm and 120cm, all of them are rock socketed piles. It is scheduled for completion in March 2003 10.
According to the geological condition at the bridge site of the bid section, the drilling equipment for the bored pile construction adopts impact drilling, and the individual short bored pile can be used as a rotary drilling rig (with a roller bit). The use of a crane reinforcement cage, concrete concrete mix automatic metering and mixing station, concrete transporting trucks concrete chute with tremie concrete. In order to avoid the pollution of the river, set the mud pool, the mud into the mud pool, after precipitation by pile completion, digging mud, stone for fill river flow.
The construction procedure of bored concrete for embedment of steel casing, driller, rushed (drilling), the first clear hole, reinforcement cage, concrete pipe under second, clear the pile to pile head and pile foundation inspection chiseling concrete into the hole, pouring underwater.
Construction process see Figure 5-3 bored pile construction process flow chart
1, pile location, drill in place
The site of the bridge site is leveled, the sundries are removed, the soft soil is replaced, and the compaction is compacted. The total station instrument is used to accurately measure th
您可能关注的文档
最近下载
- 合理使用手机主题班会省公开课一等奖全国示范课微课金奖PPT课件.pptx
- 试卷3试卷答案4《运营管理(新形态版) 》_刘蕾曹俊玲.docx VIP
- 数学新课标2022版学习重要知识点考点总结 数学新课标必威体育精装版版重点知识复习总结.docx
- 2023年中考语文二轮复习:文言文阅读 司马迁《史记》专项练习题汇编(Word版,含答案).docx
- 2024年中级银行从业资格考试《银行管理》真题汇编试卷(文末含答案解精品.pdf VIP
- 乡镇宣传工作总结PPT.pptx VIP
- 2024年疾控大学习突发公共卫生事件监测答案.docx VIP
- 车间冬季安全培训.pdf VIP
- 长阳路排水管道修复监理细则.pdf
- 你是这样的人降B正谱子五线谱乐谱曲谱歌谱高清.pdf
文档评论(0)