- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ERP 术语 函数(国外英文资料)
ERP 术语 函数(国外英文资料) Relevant special terms MRP Material Requirement Planning (Material requirements Planning) : The material requirements planning USES the material table (BOM) to convert the finished product requirements in the main production schedule into semi-finished product and raw material requirements. It USES inventory status, such as in libraries and on quantity and the material in the material master file of basic information, such as lead time and safety stock, as well as the factory calendar, to calculate how much time you want to what kind of material. MRPII Manufacturing Resource Planning: Combine production, finance, sales, engineering technology, procurement and other subsystems into an integrated system. The English abbreviation is also MRP, which is called MRPII in order to distinguish the basic MRP. MPS Master Production Scheduling (main Production Scheduling) : The schedule of the finished product in the main production scheduling, describing the time and quantity of production of a particular finished product. Main production scheduling is a program that determines the completion of production scheduling and response volume (ATP). According to the main production schedule, the material requirements planning can be calculated according to the requirements of the finished product, all components, parts, and the replenishing plan of raw materials. Main production scheduling is not a sales forecast, not a requirement. The main production schedule should consider the production planning, forecast, the delivery order, key materials, key production, and management objectives and policies. In addition to material, MPS also has a planning basis for other manufacturing resources. TPOP Time Phased Order Point (points during Order Point method) : Apply the planning logic of independent requirements, such as MRP. Its aggregate demand (GR) comes from the prediction, not the expansion of the BOM. TPOP can be used to plan the inventory or service parts of the d
您可能关注的文档
- 2010年春季中国海洋大学学位论文答辩及学位授予工作流程(国外英文资料).doc
- 2010年9月计算机二级C语言笔试真题及答案(国外英文资料).doc
- 2010年亚太机器人大赛比赛规则(国外英文资料).doc
- 2010年高考化学试题分类汇编——电化学基础(国外英文资料).doc
- 2006年教师资格(中学)教育学考试试卷及答案(国外英文资料).doc
- 2011年3月计算机等级考试二级C语言笔试(国外英文资料).doc
- 2011年9月计算机二级C语言笔试模拟题及答案(国外英文资料).doc
- 2011年自考试题及答案_管理信息系统_模拟试题及答案(一)(国外英文资料).doc
- 2012.6第三套题(国外英文资料).doc
- 20121012系统集成项目管理工程师总结(国外英文资料).doc
- 建筑工程安全保证体系与措施.pdf
- 第七章 运动和力 小专题(三) 速度的图像及计算 沪粤版物理八年级下册.pptx
- 专题02 氮与社会可持续发展 高一化学下学期期中考点(苏教版2019必修第二册).pptx
- 第三单元学习项目一+多样的复调(第一课时)课件++2025-2026学年人教版(简谱)初中音乐八年级上册.pptx
- 1.5 科学验证:机械能守恒定律 课件高一下学期物理鲁科版(2019)必修第二册.pptx
- 第三单元第3课《制陶》课件+2025-2026学年辽海版初中美术八年级上册.pptx
- 9.2 把握适度原则 高二政治课件(统编版选择性必修3).pptx
- 25秋同步导学化学九下粤教科学版教学资源9.4 化学与健康.docx
- 专题2 物质的变化-中考化学复习(人教版2024).pptx
- 15小虾课件-三年级下册语文统编版.pptx
有哪些信誉好的足球投注网站
文档评论(0)