- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
20121012系统集成项目管理工程师总结(国外英文资料)
20121012系统集成项目管理工程师总结(国外英文资料) The project software configuration management process: Establish and maintain configuration management organization guidelines. Develop the project configuration management plan. Determine the configuration identity rule. Implement change control. Report configuration status. Conduct configuration auditing. Versioning and distribution management. Configuration management consists of several activities The configuration manages the hardware and hardware resources, the configuration items plan, the baseline plan, the delivery plan, the backup plan, the configuration audit and the review, the change management Baseline configuration items including all the design documents and the source program, all configuration items operation permissions by CMO configuration managers should be strict management, as the basic principles of configuration items of operating rights management, baseline configuration items to software developers read permissions, the baseline configuration items open to PM, CCB and related personnel The basic structure of the project configuration management system: Development libraries (dynamic systems, development systems, workspace) : the information that needs to be kept in the development process for personal use by developers A controlled library (main library, primary system) : when a certain phase of the information system development is completed, the work product is stored or stored in the information. Literacy and modification of information need to be controlled. The product library (backup library, static system) : after the system test, the final product is stored in the library, waiting to be delivered to the user or the site installation. The specification of a controlled library and a product library enables the management of configuration items. Project scope management Detailed project scope statement should include the goals of the project, the scope of the project description, project deliverables, the
您可能关注的文档
- 01 C语言基础(国外英文资料).doc
- 01控制一个LED 灯的亮和灭(国外英文资料).doc
- 09会计管理会计作业(国外英文资料).doc
- 009年山东省聊城市高唐县中小学班主任远程培训(国外英文资料).doc
- 01探索者STM32F4开发板光盘结构(必读)(国外英文资料).doc
- 01-第一章 计算机的基础知识(国外英文资料).doc
- 09年 春 计算机六_1(国外英文资料).doc
- 10KV高压电缆头冷缩(国外英文资料).doc
- 1.日本研制出防瞌睡座椅提高驾驶(国外英文资料).doc
- 10个常用菜鸟必学DOS命令(国外英文资料).doc
- 第5课 植物的叶 课件 2025粤教粤科版科学三年级上册.ppt
- 第6课 花、果实和种子 课件 2025粤教粤科版科学三年级上册.ppt
- 2023青海“安全生产月”知识主题测题附答案.pdf
- 2无锡惠思特快速制造科技有限公司增材制造生产线新增项目环评资料环境影响受理公示.docx
- 第7课 植物和我们 课件 2025粤教粤科版科学三年级上册.ppt
- 五星酒店礼宾司工作总结.docx
- 2023年重庆R2移动式压力容器充装考试内部题库含答案.pdf
- 2025年基因编辑技术的脱靶效应评估.docx
- 孕期离婚协议书范本.docx
- 4.4+中国的交通运输业(教学课件)地理商务星球版2024八年级上册.pptx
有哪些信誉好的足球投注网站
文档评论(0)