- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
过水路面施组(国外英文资料)
过水路面施组(国外英文资料) The design of the project construction organization of the emergency highway branch (water surface) Ordos city jinwei construction group co., LTD Call collect emergency highway command May 2001 Design of sub-project construction organization First, the basis of preparation The construction projects shall be subject to the documents, drawings, questions and other relevant materials, as well as the relict books. The construction unit shall be required for the construction period and quality of the project. The current effective national standards and ministry of communications shall be given to the rules and regulations for highway construction. Second, the establishment principle In accordance with the general principles, general plans and overall arrangement of the project. For the allocation of manpower, material resources, financial resources, in the first consider the key and key projects at the same time, also want to arrange cohesive subgrade construction and the existing status of general engineering, time limit for a project delivery acceptance according to the requirements of the owner. In the line of careful organization, standard construction, quality first, credibility first the idea of guidance construction. Third, the project situation According to current situation of strength and causeway G110 G6 highway traffic jams, to fundamentally solve the problem of bottleneck of channel, the autonomous region will take the emergency triage, bao tong, and two measures to solve the congestion in the long run. The city of ulanzebub is planning to build an emergency gravel road in Hohhot. The highway is 68.125 kilometers long. The starting point K0 + 000 is located in the village of Chen jiagun, connecting with the maidai line, the end to hou jia kiln, and the hou jia kiln to the meidai road. The route is designed by the secondary road, and the speed is 60 kilometers per hour. At the beginning, the end is located in the area of liangcheng county, an
您可能关注的文档
最近下载
- 省级工法-装配式混凝土结构叠合板接缝防漏浆施工工法.pdf VIP
- 立体几何与空间向量高考题.docx VIP
- 三菱LEHY-3l菱云3乘客电梯调试工艺.pdf
- 蒸汽管道工程施工方案(3篇).docx
- GIS高压试验(GIS现场耐压试验、GIS出厂高压试验)-.ppt VIP
- 行测职测秒杀口诀.pdf VIP
- 建筑灭火器配置验收及检查规范.docx VIP
- 中国宫腔镜诊断与手术临床实践指南(2023版).pptx VIP
- 高考语文古诗词鉴赏真题训练2011年-2020年十年真题古诗词诗歌试题含解析答案.doc VIP
- 2025上铁浙港海铁联合物流有限公司招聘3人笔试模拟试题及答案解析.docx VIP
有哪些信誉好的足球投注网站
文档评论(0)