- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
过结构(国外英文资料)
过构造(国外英文资料) The backwind system lane is used to construct safety technical measures Pacify YangMei group yu tai coal lane 112 m long, return air system is now heading to 95 meters, the tunnel collapse column, face head-on now after drilling exploration, is expected to forward after 17 meters through the collapse column, the mine production technology, safety of relevant personnel appraisal, to pass the collapse column, set the following construction measures. A brief description of geological structure The inner wall of the frame is about 700mm thick rock at the boundary of the arch and the other rocks are more stable. Second, through construction organization For safety and rapid passage of the falling column, the establishment of the leading group for the backwind system lane. Group length: zhang wenlong technical guidance: li ruiqing, hou wei Cheng: jia jun xiang, shi jie, jia xiang xiang Construction team: engineering team Construction site: return wind system lane Team safety director: jia jun xiang Responsibilities: 1) the team leader is responsible for the work of geological construction. According to the actual situation of the roadway, the countermeasures are put forward, the implementation of the measures should be put into practice and the relevant problems in the execution of the execution. 2) and deputy team leader is responsible for the right structure is responsible for the organization and management work, runs the organization measures, on-site management measures, such as master face dynamic information in a timely manner. According to the forecast of the construction of the roadway by the team leader, the safety measures are carried out and implemented, and the safety production is guaranteed. 3), the member to be responsible for the daily organization structure management and implementation, organized construction formulated and safety technical measures to carry out and implement, implement and site management is responsible for the safety prod
您可能关注的文档
最近下载
- 第7课《定期体检 预防常见病》(教案) - 2024—2025学年人教版(2024)初中体育与健康七年级全一册.docx
- 2025林地分等定级规程.pdf VIP
- 计算机操作系统实验-解析ELF文件.doc VIP
- 智能建造技术在桥梁施工中的应用.pptx VIP
- Unit3KeepFitSectionBProject课件人教版英语七年级下册.pptx VIP
- HGT3809-2023工业溴化钠(报批稿).pdf VIP
- 小红书商业模式分析.pptx VIP
- 铜的电阻率热导率比热值热膨胀系数及杨氏模量.pdf VIP
- 第7课++定期体检+++预防常见病++课件++2024—2025学年人教版(2024))初中体育与健康七年级全一册.pptx VIP
- 粉尘爆炸重大事故隐患判定标准(图文并茂第一版)精品.pdf
有哪些信誉好的足球投注网站
文档评论(0)