管道土方回填技巧交底(国外英文资料).docVIP

管道土方回填技巧交底(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
管道土方回填技巧交底(国外英文资料)

管道土方回填技术交底(国外英文资料) Technical background Clarificaiton unit name: TieSiJu number in China: Page 1:3 pages The name of the project An expansion project of nanjing shengke water co., LTD Design document number General layout and shi - 13 The construction site The process pipe and the sewage pipe in the factory area are reclaimed Date of disclosure March 8, 2010 Technical background: Construction scope: Process piping and sewage piping in the factory area Construction preparation: Before filling in the soil, check the basis and the completion of the completed project for inspection and acceptance, and then record and accept the formalities of acceptance. Before construction, the layout of horizontal elevation marks should be done. To find high standard height points on every 10 megabytes in the pit or on the edge of the ditch, or in adjacent fixed buildings. A horizontal pile can be nailed to a large area every ten meters or so (3) to repair the temporary highway, to facilitate the passage of construction machinery and transport vehicles; Construction technology: The base clearance, check the soil quality, the layer of the soil, the roller compaction, and the check and acceptance Quality standards: The basic processing must conform to the design requirement or the specification of the construction specification. The reclaimed land must conform to the design requirements or the specification of the construction specifications. The backfill soil must be compacted by the regulations. The compaction coefficient of each layer is shown in the attached diagram. Backfill soil engineering allows for deviation Items are project Allow deviation (mm) Inspection methods one Top surface elevation + 0, 50 Check with a water level or drawing tape 2 The surface roughness 20 Check with a water level Technical background Clarificaiton unit name: TieSiJu number in China: Page 2:3 pages The name of the project An expansion project of nanjing shengke water co., LTD Design document number Ge

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档