电大专科水利水电工程《水工修建物》试题及谜底1(国外英文资料).docVIP

电大专科水利水电工程《水工修建物》试题及谜底1(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电大专科水利水电工程《水工修建物》试题及谜底1(国外英文资料)

电大专科水利水电工程《水工建筑物》试题及答案1(国外英文资料) The second semester of the 2010-2011 academic year of the central radio and television university is open specialty Water works building questions One, the correct dozen square root, the wrong dozen x, each small question 2, total 20 points. The drawing of water buildings is the first building of a water and water building. The inlet section of the diversion tunnel, the irrigation canal and the water supply in the water gate, the water station and so on. () The basic section of gravity dam is triangular because of the convenience of construction. () The arched beam method only considers the adjustment of radial deflection. (the dam has six variations, three lines, and three angles) () The direction of the flow direction of all layers of filter material in the anti-filtration layer should be made from coarse to fine. () During the seepage analysis of the sluice chamber, it is assumed that the seepage of the water head is the same as the slope of the contour of the foundation, which is called the straight line method. () The stable computing method of the sluice chamber is the same as the gravity dam, which is a unit of load cell for the single width of a meter. () The overflow of the shore that is the line between the weir and the drain line is known as a side channel spillway. The elastic force of the surrounding rock has nothing to do with the load on the lining. The section size of the non-pressure tunnel is determined by the water surface curve. Compared with the lift, the lock is large and the running cost is low, but the water consumption is large. Two, one choice question (two points per small question, 12 points) Chinas water resources are extremely abundant, and the theory of river and water resources can be as high as 100 million kW. A: 6.76 C. 2.38 For irrigation, power generation and water supply, the building of water from upstream to downstream is called (). A. take water building b. drain the building C. clean buildings

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档