浅议柱梁板同时浇筑(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅议柱梁板同时浇筑(国外英文资料)

浅议柱梁板同时浇筑(国外英文资料) Shallow column beams are cast at the same time Date of collection:Introduction: Yang zuolong (1973), male, engineer, inner river vocational technical college, sichuan inner river 641000 Yang Zulong Pick to: the brief introduction of the advantages of column beam slab casting method at the same time, based on the detailed analysis and expounds the deficiency of the method, pointed out that the existence of pouring control at the same time Difficulty coefficient increases, maintenance difficulties, carbonization degree is deep, easy to cause the defects such as collapse, put forward to guarantee construction quality and reduce safety accidents, unfavorable use this method. Keywords: simultaneous casting, defect, strength and strength Middle image classification number: TU755. 6 document identification code: A Column beam slab construction at the same time, through the floor after alignment positioning, for frame column rebar tie, then the frame beam, plate supporting system and for the template, then the tie beam steel and installation, at the same time of steel plate and pipe network of frame column template installation, the last column beam slab concrete one-time casting. This kind of construction technology in the practical operation has many advantages, can speed up the construction schedule, construction enterprise organization construction, reduce the construction cost, and beam-column node better visual quality. In practice, the beams and columns of the beams are made of the concrete and the concrete observation quality is better. Therefore, someone put forward: when the pillars high strength grade of concrete strength grade of concrete beam plate is less than the secondary (10 mpa), can consider beam-column node concrete beam slab concrete is poured together with [1]. Column and beam slab should be respectively by the C40 concrete strength and C25 or C45 and C30 design, namely the strength is not greater than level 3, whether in t

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档