- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水工施工图设计说明(国外英文资料)
水工施工图设计说明(国外英文资料) Qidong daedda heavy industry co., LTD. Outfitting the wharf project Description of hydraulic construction drawings directory 1, engineering profile 1 Second, natural condition 2 Construction considerations and quality requirements 4 The corrosion design requirement 6 Five, the other seven Qidong total heavy industry co., LTD., outfitting dock engineering hydraulic construction drawing design Qidong daedda heavy industry co., LTD. Outfitting the wharf project Description of hydraulic construction drawings First, the general situation of the project 1. The content of engineering The project consists of two outfitting quays and a bridge, which will be constructed in a phased manner. First post terminal (1 # pier) and revetment construction approach to the interior wharf, perimeter wharf (2 # pier) and the lateral approach according to the arrangement of the owner to organize and implement. According to the layout of the factory and the characteristics of the terrain, the outfitting quay is laid on the west end of the sea side of the factory. Using inverted outfitting dock F type is decorated, approach span arrangement, on the west side of pier outside port (2 # pier) and inside (1 # pier) adopts double side on a ship, the west side of 2 # dock port wharf eastside distance line extension, about 60 m. 2 # pier 520 m long, 25 m wide, 5.00 m wharf surface elevation, the lateral (2-2 # fitting-out berth) of 30 ton, frontier mud surface design height of 11.00 m, the medial (2-1 # fitting-out berth) of 10 -, frontier mud surface design height of 9.50 m. 1 # wharf is 475m, wide 20m, a mooring pier at 35m on the east end of the dock, and a wide, 2m pedestrian bridge between the pier and the mooring pier. The surface elevation of the wharf is 5.00 m, the outside (1-2 # outfitting berth) and the inside (1-1 # outfitting berth) are all 100,000 tonnage, and the front-end mud surface design is -9.50 m. The bridge between # 1 and # 2 is the front bridge, 225m long
文档评论(0)