桥面展装施工标准工艺(国外英文资料).docVIP

桥面展装施工标准工艺(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥面展装施工标准工艺(国外英文资料)

桥面铺装施工标准工艺(国外英文资料) The construction standard technology of the deck pavement ? First, preparation for construction Close the stone and the beam body, make good measure control. In particular, the control of the height of the mat; At the same time, the standardization of the elevation and flatness of the beam surface is achieved, which is the foundation for the construction of the pavement. 2, clarify your thinking and determine the method. The deck of the bridge is carried out after the construction of the anti-collision barrier. The bridge to the whole picture of the second construction method is adopted, the sides and middle construction three 1250 px concrete sideband first, and then use the half range paving paving leveling machine, crane or pump car cloth. The selection of the concrete proportioning ratio shall be constructed according to the proportion approved by the director and the supervising unit. The concrete supply bridge is packed with C50 waterproof concrete, which is supplied by the construction site mixing and standing, and the concrete mixer carriage. Second, the construction process flow chart of the bridge Third, key construction techniques and methods Bridge cleaning (processing) Follow: one chisel two blow three blow the principle of wash. 1.1 on bridge deck laitance, ballast, sundry thoroughly chisel, cleansing, generally USES machines and artificial cut hair hammer chisel, cooperate with the methods of integral trawl forward, complete the bleeding on the deck, ballast, all cleaned up debris, the work is very important, directly affect the degree of density of bridge deck pavement and the connection of beam end face. 1.2 bridge deck laitance, ballast and after completion of cleaning, artificial use brooms for cleaning, again with high-pressure wind bridge deck residual dirt, and then use water cannons to wash and bamboo broom or steel brush to clean again, flush along the bridge cross slope, and debris from the drainage hole, the water after

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档