- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水工施工工艺(国外英文资料)
水工施工工艺(国外英文资料) Hydraulic construction process (home furnishings) A, slot 1, the groove width is 10 to 20mm per side The depth of the cold water is 10 mm from the wall, the hot water pipe is 15 mm from the wall The parallel vertical spacing is greater than 200 mm when the hot water pipe is slotted Pipe laying 1, if there is hot and cold water, vertical, left hot right cold, parallel time, upper heat is cold and the distance between the two tubes is greater than 200 mm Pipe outlet position A, wash bath should be in 1200 millimeter, if have pelvic bath should be 630 millimeter B, the wash basin, the bottom water is 450 mm, the top is 1000 mm C, toilet seat, water next 250 mm (commonly used), up to 580 mm (not used) D, the mop should be in 800 mm, the washing machine USES 1200 mm 3, when the ground laid, fixed time interval should be in 1 m to 1.2 m, by 1:2 cement mortar protection, the condole with fixed tube and roof span should be 10 mm or more, hot water is 600-800 mm, 800-1000 mm cold water, vertical fixed, 500-600 mm hot water, cold water 600-800 mm, but at the outlet of 150-200 mm must be fixed. Pipe connection 1, the aluminum composite works special pipe, but no joint at the installation 2, PPR pipe connection, must use the same parts manufacturer, and according to the manufacturer to provide, hot melt tool and the heating temperature of 260 degrees - 270 degrees c + / - 5 degrees Celsius, the heating time for 10 seconds or so commonly, cooling time is 3 to 4 minutes, pay attention to in 4 seconds after heating tubes inserted into the pipe is not allowed to turn the pipe fittings and pipe 3, PPR tube welding procedure A, note that the length of the piping heating is equal to the depth of the joint The schedule is as follows: Pipe diameter The depth of the weld Solution time (second) Insertion time (second) Cooling time (minutes) 20 14 5 4 2-3 25 15 7 4 2-3 Note: when the temperature change is less than 5 degrees Celsius, the heating time is increased by 50% 4,
文档评论(0)