水工举动办法保护(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水工举动办法保护(国外英文资料)

水工设施维护(国外英文资料) 5?? Water worker maintenance?? 5.1?? The general? 5.1.1?? In accordance with the measures for the safety management of dam dam, the regulations on the management of electric power industry technology and the general rules for the management of the reservoir project. ? 5.1.2?? The maintenance of water works is suitable for the maintenance of water works in the power plant of the collargold mountains and hills. ? 5.1.3?? General principles of hydraulic building maintenance? 5.1.3.1?? The maintenance of water works is divided into four categories: daily maintenance, precession, major repair and repair. ? 5.1.3.2?? Daily maintenance is found according to the daily inspection for routine maintenance and the problem of local repair, to maintain the normal operation, building complete and approved by the competent production vice President. ? 5.1.3.3?? The precession is based on the companys annual detailed survey of the problem, the need to compile the precession plan, and the company shall submit it for approval. ? 5.1.3.4?? When building large damage, repair, quantity is big, technical difficulty is big, long construction period, should establish specialized overhaul plan and design report, submitted to the superior departments after approval. ? 5.1.3.5?? Emergency accidents occurred when the hydraulic structures, affect the normal operation, safety, and shall organize forces to repair, and promptly report to the superior administrative departments to take further measures. ? 5.1.4 ensuring?? After maintenance, the building does not change the operating mode of the design rules, and when it is necessary to change the mode of operation, it should be approved by design review and submitted to the competent authority for approval. ? 5.1.5?? Modification or change the hydraulic structures, structural form, must put forward project report, please review, original design or related scientific research unit for examination and approval of the competent unit, be

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档