桥梁孔跨安排绳尺小结(国外英文资料).docVIP

桥梁孔跨安排绳尺小结(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥梁孔跨安排绳尺小结(国外英文资料)

桥梁孔跨布置原则小结(国外英文资料) Principle 19: due to the influence of bad geology, the layout should follow the following points: (1) the base of the platform should not be set on the soft and uneven foundation soil. (2) the site should avoid fault, landslide, crush broken belt, limestone cave The bad geology such as the karst, loess cave and dark hole or local soft ground. (3) when building a platform on a steep hillside, it should pay attention to the stability of the base and the lateral rock Sex. (4) the foundation of the ridges near the steep rock wall should be avoided by the fall of an underwater hillside Accumulation. Principle 20: building a bridge in a longer historic area Address clear structures of existing or remain in the area of investigation, such as underground pipeline (water supply pipe, drainage pipe, communication optical cable, cable, gas pipes, etc.), revetment, wharf, flood prevention wall, embankments and the ripped-rock revetment and other kinds of hydraulic structures, properties and structure of all kinds of buildings and so on, in order to determine whether the pier foundation give way, or the original structure demolition, modification, or to close to the base structure to take protective measures, etc., if necessary, deal with adjacent buildings, structures or to evaluate stability of soil. Principle 21: in the interchanges, and layout of the bridge should be avoid as far as possible bifurcate bridge or a sharp turn, if unavoidable, should be in the crotch, bridge deck width fusion or a sharp turn in set up the bridge, the bridge bearing in good condition. In addition, in the intermodal three-dimensional intersecting, the arrangement of the bridge group on the horizontal surface should strive for symmetry, and the bridge is well permeable. Principle 22: for crossing river and then to realize large-scale bridge of interchange and riverside road, to properly handle the good points across across a river and overpass the problem of the relationship be

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档