桥台台背回填施工处理及施工工艺(国外英文资料).docVIP

桥台台背回填施工处理及施工工艺(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥台台背回填施工处理及施工工艺(国外英文资料)

桥台台背回填施工处理及施工工艺(国外英文资料) Back filling and construction process of bridge table The bridge jump car is one of the quality of highway project construction quality, not only affects the comfort of the driving, but also brings the safety hazard to the driving. Therefore, it should follow reasonable construction technology and strict construction quality control to ensure the safety and safety of the bridge. Analysis of the cause of bridge jumping There are many factors that make the bridge jump, but there are several main points: (1) the bearing capacity of the bridge foundation and subgrade base is not consistent, under the same load, the foundation settlement differences (general bridge foundation settlement are smaller, base and subgrade settlement is larger), especially the soft base period, the difference is bigger. (2) the bridge concrete structure (rigid) and structure properties of subgrade pavement (semi-rigid and flexible) is different, so the two different structural junction, there will always be differences. (3) the construction quality is poor, the backpacking compaction of the platform fails to meet the requirements of the specification, causing the back of the table to settle down. The solution to bridge jumping The above three factors, the first and second factors can be settled through perfect design, and the third factor is man-made, need to improve the quality of on-site construction personnel consciousness, strengthen control construction link, optimize construction technology to be solved. Quality control of site construction process We will carry out the backfill construction under the precondition of strict execution. According to the comprehensive analysis, the owner of the bridge head should not be strictly due to the construction due to the lack of responsibility of the construction staff. Therefore, we should choose serious and responsible work, has the construction experience of the technician is responsible for the work, strictly control th

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档