桩芯混凝土浇注计划(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桩芯混凝土浇注计划(国外英文资料)

桩芯混凝土浇注方案(国外英文资料) Pile core concrete construction plan 1, the general situation of The base of the main building of A and D is made of artificial excavated piles, and the design of the pile diameter is 1600, 1700, 1800, 1900, 2000, and 2100, and the basic conditions are as follows. The serial number The pile type Diameter (D) (A) pile diameter The number of pavilions pile The number of total one ZJ1 1600 1700 4 8 2 ZJ2 1700 1800 14 28 3 ZJ3 2000 2100 4 8 4 ZJ4 1800 1900 15 30 The concrete strength of pile core is C35 and the engineering quantity is about 4000m3. Material selection Medium sand, 20-40 gravel, 42.5 R regular Portland cement Site construction condition In A construction site, A building foundation pit side of A mixing plant, building A station is equipped with 1 JS750 concrete mixer, two batching machine and A pump, A mixing plant are now equipped with 1 D JS750L concrete mixer, 1 batching machine. Between the holes in the foundation pit, there are 80 thick and 2500-3000 wide C10 concrete padded pavement. Construction preparation According to the design requirement, bind the steel cage, and carry out the hidden acceptance, after the inspection and acceptance, the pile core concrete should be poured as soon as possible. Before pouring the pile core concrete, the residue of the protective wall and the water on the bottom of the hole should be cleaned up. Before construction, adequate labor should be arranged according to the quantity of engineering and construction equipment, and the continuity of concrete pouring shall be guaranteed. Before construction, the work of safety and technology should be made. Construction of pile core concrete 1) the mixing of concrete According to the quality inspection station through experiment provides the concrete mix proportion, all materials are strictly to the scale, and by the specialist is responsible for the supervision, with the rate of large JS750 concrete mixer mixing concrete at the scene, according to the qual

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档