- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工放样基础方法-----已知高程的放样(国外英文资料)
施工放样基本方法-----已知高程的放样(国外英文资料) The basic method of construction and lofting is known as the lofting of the elevation The high-altitude set of tasks is to set the design elevation to the designated pile position. In engineering construction, such as in the flat ground, the excavation of foundation pit, route for slope and abutment pier design elevation, etc, often need to elevation layout. The method of high range lofting is mainly measured by leveling, and sometimes the method of measuring vertical distance or trigonometric height is measured directly by steel ruler. Elevation layout, the first need in the test zone setting a certain density of leveling point (temporary leveling points) as the lofting points, then according to the design elevation height of lofting point position in the field calibration. Elevation position calibration measures can be determined according to engineering requirements and site conditions, conditions of engineering pile is commonly used in calibration lofting elevation position, can be in row horizontal line or on the side of the wooden calibration on top of the pile; Concrete and masonry projects are usually marked with red paint on their faces or templates. The usual height is lofting In general, the position of lofting elevation is lower than the line of sight and the length of work is not above the level. As shown in figure 2.6, A is A given point, whose height is HA, and wants to set the height for HB at B. Specific lofting process is: first playing A long wooden stake in point B, put level between A and B, at the point A level ruler, rear view A ruler and reading A, calculate the B level ruler should be forward-looking reading B: B = (HA + a) - HB (2.5) Figure 2.6 lofting Erected on point B wooden side level ruler, move up and down level ruler, when the level on the scale reading just as B, draw a horizontal line from the bottom of the pile side close to the feet, the horizontal line is the design elevation position of HB. It can
文档评论(0)