- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工员试题精选(国外英文资料)
施工员试题精选(国外英文资料) An anthology of the workers questions Chinese Internet test responsibility editor: wind fire Thea update time: June 18, 2012. One, single topic: The slope of the slope is l: 0.25, the width of the base is 800mm, and the depth is 2m (c). A 800 B, 1300, C, 1800, D, 800 The maximum size of the gravel is not to exceed the thickness of each layer (A). A 2/3 B l over 2 C 2 over 5 D 1/3 The axis of brick masonry allows for the deviation of (D) mm. A 20 B 15 C 12 D 10 Foot pallet should be more than (B) mm when applied to be laid. A 200 B 300 C 400 D 500 One of the quality requests of electroslag pressure welding is that the axis deviation should not be greater than (D) steel diameter and not greater than 2mm. A 1/2 B l / 4 C l / 8 D 1 / lO The spacing between the end of the steel bar and the beginning of the steel bar should not be less than the diameter of the bar. A 15 B 12 C 10 D 8 The three main working parameters of the crane are (C). The power of A motor, rising height, height of work B rise, work amplitude, maximum weight C starting weight, lifting height, working range D lifting height, working range, motor speed To control the smoothness and vertical degree (C). A hanging line B is made of grey cake, and the dash is layered and it is layered The paint brush should be applied (C). A is dips in each brush B with A long brush c. D to besmear to brush When the slope of the roof is within 3 to 5 percent of the grade, the section (C) roof is tiled. A parallel B is perpendicular to c or perpendicular to D The construction seam of the wall should stay above the surface of the floor and not be less than (A) mm above. A 300, B 200 C 150 D 120 It is advisable to use two-step feeding method in winter construction. The water temperature may not exceed (D) ℃ A 95 B 90 C 85 D 80 The construction is divided into two construction processes. Before construction, who should be prepared for one day, each construction process takes four days, in turn, the construction
您可能关注的文档
最近下载
- 品管圈PDCA获奖案例-精神科提高住院病人精神障碍作业治疗参与率医院品质管理成果汇报.pptx
- 基于混频非结构化数据的中国碳价预测.pdf VIP
- 《德固赛树脂产品资料》.ppt
- 全球变化课件06新生代衰落与第四纪.pptx VIP
- 2025年全国翻译专业资格(水平)考试土耳其语一级笔译试卷.docx VIP
- Unit 4 Amazing Plants and Animals Section B(1a-2d)课件 2025人教版英语八年级上册.pptx
- 全球变化课件新生代衰落与第四纪.ppt VIP
- 公安信访与警调对接课件.pptx VIP
- 高等数学(上册)(同济大学数学系)PPT全套完整教学课件.pptx
- 食材配送时间安排计划.docx VIP
文档评论(0)