施工员试题精选(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工员试题精选(国外英文资料)

施工员试题精选(国外英文资料) An anthology of the workers questions Chinese Internet test responsibility editor: wind fire Thea update time: June 18, 2012. One, single topic: The slope of the slope is l: 0.25, the width of the base is 800mm, and the depth is 2m (c). A 800 B, 1300, C, 1800, D, 800 The maximum size of the gravel is not to exceed the thickness of each layer (A). A 2/3 B l over 2 C 2 over 5 D 1/3 The axis of brick masonry allows for the deviation of (D) mm. A 20 B 15 C 12 D 10 Foot pallet should be more than (B) mm when applied to be laid. A 200 B 300 C 400 D 500 One of the quality requests of electroslag pressure welding is that the axis deviation should not be greater than (D) steel diameter and not greater than 2mm. A 1/2 B l / 4 C l / 8 D 1 / lO The spacing between the end of the steel bar and the beginning of the steel bar should not be less than the diameter of the bar. A 15 B 12 C 10 D 8 The three main working parameters of the crane are (C). The power of A motor, rising height, height of work B rise, work amplitude, maximum weight C starting weight, lifting height, working range D lifting height, working range, motor speed To control the smoothness and vertical degree (C). A hanging line B is made of grey cake, and the dash is layered and it is layered The paint brush should be applied (C). A is dips in each brush B with A long brush c. D to besmear to brush When the slope of the roof is within 3 to 5 percent of the grade, the section (C) roof is tiled. A parallel B is perpendicular to c or perpendicular to D The construction seam of the wall should stay above the surface of the floor and not be less than (A) mm above. A 300, B 200 C 150 D 120 It is advisable to use two-step feeding method in winter construction. The water temperature may not exceed (D) ℃ A 95 B 90 C 85 D 80 The construction is divided into two construction processes. Before construction, who should be prepared for one day, each construction process takes four days, in turn, the construction

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档