施工企业已落成未结算款的成因及对策(国外英文资料).docVIP

施工企业已落成未结算款的成因及对策(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工企业已落成未结算款的成因及对策(国外英文资料)

施工企业已完工未结算款的成因及对策(国外英文资料) In connection with the cause of the completed outstanding payment, the detailed analysis is as follows:? ???? Whether the part of the measurement of the delay of measurement is obtained, whether the approval of the owners approval is timely obtained, whether the project is settled or not. This part to control the contract bill of quantities and measurement rules, part of the contract within generally there is no problem, as long as have a measuring line, after the next general lag one to three months. The construction enterprise may be required to provide the first formal metered documents of the balance sheet in the future. Change any of the claim, as content in addition to contract, may be required to reasons for specific projects, construction enterprises and amount, at the same time required to provide supervision to sign to recognize, owners approval, protocol and other supporting documents, and to check computation on the basis of experience. ? ???? 2, actual cost the payment of fees and the cost of a part, to see whether there is than in the subsequent process or component division project has finished workload higher gross margin, larger profits space, with enough to cover this cost. The construction enterprise may be asked to compile the income and cost of the work portion of the work. According to the current construction market present situation and the tender offer, in general, as a result of the existence of unbalanced quotation, the quotation of the antecedent work of construction enterprises will be higher, so that their money back as soon as possible, and easy to get big profits from changes in the claim. So the early stage of the project if you have this kind of open cost less than a tired tired confirmed contract actual costs incurred, should high attention, there are deliberately less cost, higher profits. ? ???? 4, completed unfinished management? ???? As business operators must strengthen the construction completed set

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档