- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
报矿2011年7月 301筛子大梁调换装办法(国外英文资料)
报矿2011年7月 301筛子大梁更换装措施(国外英文资料)
The construction safety technology measures for the construction safety of the coal plant 301 are replaced by the coal plant
First, the project summary
Ding set coal preparation plant 301 # into washing raw coal sizing screen since December 2007, to August 2011 has been used more than two and a half years, due to the raw coal mine coal ash is high, large amount of raw coal washing, considering the quantity of coal mine in the future, the quantity is much, in order not to affect the normal coal washery coal washing, so use mine production maintenance time of girder replacement. The related parameters of sieve is: the type of Bruce 610-2-2-360 * * HE150LS, amplitude of 11.7 mm, 13 mm, sieve seam Φ capacity 1140 t/h. It is located on the 4th floor of the main washing workshop of the coal preparation plant. In order to complete this task safely and quickly, special safety technical measures are prepared to be submitted for trial.
Second, preparation for construction
Organize all the maintenance personnel to study the safety procedures and safety technical measures of the coal plant.
2. Check for lifting driving carefully and inspect its driving mechanism, brakes, lifting wire rope and take root in the roller, to ensure safe and reliable.
Prepare the tools for the construction. (including two tons of hand-pulled gourds 3-4, wire rope 4-6, welding one set (oxygen, acetylene with the use of the following), lighting two sets of live lighting, safety ropes four).
The large beams that are to be replaced before parking are to be transported to the side space of the shaker.
All participants must be familiar with the workplace environment and understand the work.
The electrician, welder and the heavy industry must have special work permit and no proof of duty.
There are designated conductors in the maintenance and follow the rules.
There is a security officer at the scene who finds the safety problem in time and removes it in the bud.
Third, const
您可能关注的文档
最近下载
- 医院常见护理标识ppt.pptx
- 标准图集-10S505-柔性接口给水管道支墩.pdf VIP
- 新人教版高中数学选择性必修第二册全套课件全套讲义全套同步作业(2318页).pptx VIP
- 污水处理厂运营服务方案投标文件 技术方案.doc
- 新人教版高中数学必修第一册全套课件练习题(3400页).pptx
- 设备维修岗基础测试试题及答案.docx
- 2025新人教版语文七年级下册《第三单元》大单元整体教学设计[2022课标].docx
- 新人教版高中数学必修第二册复数全套PPT课件.ppt VIP
- 吕维智讲座《生成式人工智能(GAI)为初中物理教学增效实操》(第三部分).pptx
- 蛋种鸡饲养管理.pptx VIP
文档评论(0)