手机看二建市政(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
手机看二建市政(国外英文资料)

手机看二建市政(国外英文资料) One, a single choice question (70 questions, 1 point per problem. Only one of the candidates for each question is the most important one). The thought of the hammer sinking the pile () A hammer weight -- hammer type -- pile frame B hammer -- hammer weight -- pile C pile - hammer weight - hammer type D pile - hammer-weight The method of fixing soil quality in the foundation is () A change B, C, and the D sheet pile The percentage of lime dry reoccupy () is referred to as lime in lime stable soil. A dry calcareous earth weight B limestone heavy C dry earth heavy D The surface layer of concrete concrete pavement of our country is more used () concrete slab A normal B compacted C for continuous reinforcement D reinforcement Construction of concrete pavement, according to the strength of concrete, the design of the mix ratio. A compression-resistant B resistance to shear D 6, the pavement bearing layer is () A face layer B mat layer C base D 7, when the scaffold of steel pipe is removed, the () should be put first A progress B quality C security D cost Prestressed tendon cutting without () cutting A cut off machine B grinding wheel saw C battery, acetylene - oxygen To divide structural sections into two working faces, the shallow and dark excavation method of step checking is (). A step method B is A method of the method C Water testing of concrete cisterns, allowing for water penetration not exceeding () L/m3 A 2 B 2.5 C 3 D 3.5 The HDPE film impermeable layer shall not be in () construction A spring, summer, summer, summer, and winter Radio 1-5; BACAB 6-10; DCCBB 11-15 AACDA 16-20; BBDAA Second, multiple-choice (10 items, 2 points each. Each alternatives, to match, the idea has two or more than two at least one item by mistake. Wrong choice, do not bear on the score; less, 0.5 points each option selected) The section of the tunnel is divided into (). A horseshoe B rectangle C arched D oval What should not be the primary level of the road is () A lime-l

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档