- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
手机看二建市政(国外英文资料)
手机看二建市政(国外英文资料)
One, a single choice question (70 questions, 1 point per problem. Only one of the candidates for each question is the most important one).
The thought of the hammer sinking the pile ()
A hammer weight -- hammer type -- pile frame B hammer -- hammer weight -- pile
C pile - hammer weight - hammer type D pile - hammer-weight
The method of fixing soil quality in the foundation is ()
A change B, C, and the D sheet pile
The percentage of lime dry reoccupy () is referred to as lime in lime stable soil.
A dry calcareous earth weight B limestone heavy C dry earth heavy D
The surface layer of concrete concrete pavement of our country is more used () concrete slab
A normal B compacted C for continuous reinforcement D reinforcement
Construction of concrete pavement, according to the strength of concrete, the design of the mix ratio.
A compression-resistant B resistance to shear D
6, the pavement bearing layer is ()
A face layer B mat layer C base D
7, when the scaffold of steel pipe is removed, the () should be put first
A progress B quality C security D cost
Prestressed tendon cutting without () cutting
A cut off machine B grinding wheel saw C battery, acetylene - oxygen
To divide structural sections into two working faces, the shallow and dark excavation method of step checking is ().
A step method B is A method of the method C
Water testing of concrete cisterns, allowing for water penetration not exceeding () L/m3
A 2 B 2.5 C 3 D 3.5
The HDPE film impermeable layer shall not be in () construction
A spring, summer, summer, summer, and winter
Radio 1-5; BACAB 6-10; DCCBB 11-15 AACDA 16-20; BBDAA
Second, multiple-choice (10 items, 2 points each. Each alternatives, to match, the idea has two or more than two at least one item by mistake. Wrong choice, do not bear on the score; less, 0.5 points each option selected)
The section of the tunnel is divided into ().
A horseshoe B rectangle C arched D oval
What should not be the primary level of the road is ()
A lime-l
您可能关注的文档
最近下载
- 中学食堂建设项目社会稳定风险评估报告(模板范文).docx
- 第9课 互传密信有诀窍 教案 义务教育人教版信息科技五年级全一册.docx VIP
- 根本原因分析精神病人自杀RCA.pptx VIP
- SL523-2024 水土保持监理规范.docx VIP
- 路面结构层厚度评定表(代表值自动计算).xls VIP
- 雨虹防水质保合同范本Word模板.docx VIP
- 旅游产品策划与设计422全书教学课件电子教案.ppt
- Toll样受体信号通路中MyD88的研究进展_吴燕燕.pdf VIP
- 2024水土保持工程施工监理规范.docx VIP
- 义务教育版(2024)五年级全一册 第1课 生活处处有算法 教案.docx VIP
文档评论(0)