Before construction of plastic floor, carpet, hard fiber board, etc., before the construction of the surface layer and the power line, and after the test pressure of the pipe equipment. The final coating of the floor of the wood floor, should be completed after the completion of the pasting project:
5, the pasting project shall be completed after the finishing of the coating and painting of the ceiling, wall, doors and Windows and construction equipment.
Article 1.12 the environmental temperature of construction of decoration projects inside and outside the room shall meet the following requirements:
A brush, pulp, finishes, and ornamental design engineering and senior plaster, solvent mixed color coating engineering should not be less than 5 ℃ :
Second, the intermediate and ordinary plaster, solvent mixed color coating engineering, as well as glass engineering should be above 0 ℃ :
Three, pasting project should not be below 10 ℃ :
When using adhesives, the temperature construction required by the adhesive product description is required:
Five, besmear brushs varnish should not be less than 8 ℃, the temperature of the latex paint should be in accordance with the requirements of the product description construction:
Six, besmear outside lime mortar shall not be less than 3 ℃.
Note: the environmental temperature is the lowest temperature in the construction site.
Indoor temperature should be measured near the outer wall of the outer wall by 500mm.
Article 1.13 decorative projects shall be protected by finished products, water for construction and test of piping equipment, and no damage to decoration projects.
Article 1.14 the requirements for the construction safety technology, labor protection, fire prevention and anti-poisoning of decoration projects shall be carried out in accordance with the relevant provisions of the state. The material should be piled up with safety fire protection.
Chapter ii the project of plaster
Section 1 general provisions
您可能关注的文档
最近下载
- U8V11.1培训课件9U8V11.1新版功能介绍生产制造幻灯片.ppt VIP
- GB_T 9711-2023 石油天然气工业 管线输送系统用钢管.pdf VIP
- 1kv母线调试报告.pdf VIP
- 过滤实验-课件.ppt VIP
- GB_T 14264-2024 半导体材料术语.pdf VIP
- 消防系统的联动常见故障.ppt VIP
- (完整版)供应商合规管理制度 .pdf VIP
- JBT 12786-2016 升降工作平台 术语与分类.pdf VIP
- 2024东南亚电商市场报告.pptx VIP
- 第七单元 跨学科主题学习——项目开展,探究丝绸之路 学习任务单 苏科版初中信息科技七年级下册.docx VIP
文档评论(0)