50米T梁浇注方法(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
50米T梁浇注方法(国外英文资料)

50米T梁浇注方法(国外英文资料) Shallow analysis of precast construction technique of 50mb concrete T beam Author:? Anonymous?? Source:? Original?? Time:? April 14, 2010?? 27 hits: With the emergence of prestressed concrete technology, novel prestressed concrete Bridges is developed with extraordinary speed, all kinds of bridge are constantly emerging. Early in the 21st century, the application technology of the long-span 50 m T beam have been mature and popular, and 50 m T beam precast technology, compared with 25 m, 30 mt beam at the bottom of the pedestal mold production, concrete pouring construction technology on to more complex systems, such as, for our bridge workers, will have a good professional technology and skilled construction experience. Hengshui, the author took part in the line in the section of the shide, jingjiu railway bridge crossing engineering construction (hereinafter referred to as the iron bridge), in the 50 m prestressed concrete T beam in the precast construction aspect, we adopted the following construction technology for reference. One, the concrete T beam pedestal prefabricated Make a t-girder Some projects in the past the beam use PVC board or leather do T beam bottom die, but after the casting caused by concrete hydration heat effect of PVC board or leather stretch forming creases, make the T beam bottom is not flat, water chestnuts and PVC plate juncture between bad handling of the slurry, water chestnut bottom forming textured, with a large number of T beams in this project to deny, and terrazzo bottom die hard, high temperature resistant, small scale, make the precast beam body surface smooth, bright and clean, the best results. The work of taichung The width between the platform and the platform is 4m, and the distance between each row is 1m. The base of the pedestal must be compacted,At the same time with a small gap between vibrators along corrugated pipe and steel insert vibrating, but will have to fight a vibrator to touch, corrugated pipe

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档