截流方法(国外英文资料).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
截流方法(国外英文资料)

截流方式(国外英文资料) River closure project: refers to the diversion drainage buildings close to completion, namely in the invasion way or a shore buildings on both sides of the peak embankment form longkou, longkou and protection, to guide drainage buildings after completion, the favorable opportunity, in the shortest time to longkou plug, truncated rivers. The basic method of river closure with stroke closure piece of river closure, blasting the closure, the gate, and other grasses crib, steel sheet pile, soil and abatis weir, hydraulic filling method of river closure, etc. The method of selecting the intercepting method should fully analyze the hydraulic parameters, the construction conditions and the difficulty, the quantity and the properties of the projects, and the technical economic comparison. (1) block: the flat plug is a bridge or trestle at longkou, which is carried by self-discharging cars or other means of transport, and throws at the front of the dragon mouth. As the flow rate increases, it gradually throws up large blocks of material, so that the mound will rise steadily under the water until it rises above the water and cut off the riverbed. Kung, dike - is the water resources and hydropower engineering construction of river closure, the way into the water and toss precast concrete blocks, local materials filling material formation permeable YanTi across rivers. Due to peak embankment has the characteristics of high mechanical strength, based on convenience, very beneficial to in a short period of time through river on both sides, forming favorable construction channel, so water resources and hydropower engineering cofferdam construction is usually carried out on the basis of the peak dike. When kung, dike closure, due to the longkou large flow, high flow rate per unit width, space narrow, therefore kung, dike ends when the final closure is easy damaged by erosion, before the final closure for kung, dike end bumper reinforcement. After the heidong levees me

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档