- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
成本操纵与剖析(国外英文资料)
成本控制与分析(国外英文资料)
Construction cost control and construction cost analysis of 2Z102040
2Z102041 is based on the control of construction cost
Project contract
Construction cost control should be based on project contract, around the target, reducing the project cost from two aspects of the budgetary revenues and actual cost, explore the potential for increasing earnings and practicing economy, in order to achieve maximum economic benefits.
Construction cost plan
Construction cost plan is drawn up in accordance with the actual conditions of a construction project construction cost control scheme, both due to specific cost control target, including the measures taken for realizing the objective of the control and planning, is the guidance of the construction cost control file.
Progress report
The progress report provides the important information about the actual completion of the project and the actual payment of the construction cost. Construction cost control is working on the actual condition compared with construction cost plan, find out the difference between them, analyze the reasons of the deviation, so as to take measures to improve after work. In addition, the progress report also help managers to find the problems existing in the project, and before things get hasnt caused great losses to take effective measures to avoid the loss.
Engineering change
In the implementation of the project, engineering changes are difficult to avoid because of various aspects. Engineering change generally includes design change, schedule changes, construction conditions change, technical specification and standard changes, the construction sequence change, engineering quantity change, etc. As soon as the changes are made, the amount of engineering, the period and the cost will change, making the construction cost control more complex and difficult. Therefore, the construction cost management should be based on the change requirements of all kinds of data calculation and analysis
您可能关注的文档
最近下载
- 【行业标准】NBT 47041-2014 塔式容器.pdf
- 内蒙古版三年级综合实践活动指导第3单元主题活动四《多彩的泡泡》.ppt
- 老年痴呆护理查房ppt.pptx
- 感冒药的正确使用.pdf
- 调色师:达芬奇视频剪辑调色从入门到精通第11章 综合案例:制作《云彩之美》效果.pptx VIP
- 调色师:达芬奇视频剪辑调色从入门到精通第10章 综合案例:制作《银河星空》延时效果.pptx VIP
- 2020年上海黄浦区高三二模语文试卷(答案、解析版).pdf VIP
- 调色师:达芬奇视频剪辑调色从入门到精通第9章 抖音热门调色.pptx VIP
- (正式版)G-B 4839-2009 农药中文通用名称.docx VIP
- 语文一年级上册核心素养教案全册.pdf VIP
文档评论(0)