培植项目完工财务决算报表填表说明(国外英文资料).docVIP

培植项目完工财务决算报表填表说明(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
培植项目完工财务决算报表填表说明(国外英文资料)

建设项目竣工财务决算报表填表说明(国外英文资料) The attached 6: A statement of the financial statement of the construction project is completed A cover, Construction unit: refers to the unit name of the project. Construction project name: the project name that is approved by the feasibility study report. Construction properties: fixed asset investment is divided into new, expanded and rebuilt. Date of compilation: the date of the official submission of the financial statement of the completion of the project. Second, we will establish an overview of the basic building project of the table Construction address: fill in the location of the project location. The main design unit: the unit that the construction unit entrust to the construction project body undertakes the design. Main construction enterprise: refers to the enterprise that is engaged in the construction of the project subject. Covers an area of Design floor area: the area that the design institute calculates by the construction drawing. Real area of cover: the actual amount of land that is measured at the time of completion. Total investment: refers to the total amount of funds paid for the construction of a project. Total investment in design: refers to the total investment of the project when the ministry of education approves the feasibility study report. Total investment: refers to the total amount of money that is actually paid in the course of the construction project. New production capacity (benefit) : in reference to the new production capacity (or engineering benefit) catalogue issued by the national bureau of statistics (NBS) Construction and stopping time: refers to the period in which the construction project starts from construction to completion. Construction is generally referred to as the day of the project; The date of completion of the completed acceptance shall be the date of completion of the inspection and acceptance by the construction administrative department. Design and construction start-stop time: t

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档