双代号收集图绘制中的虚箭线剖断(国外英文资料).doc

双代号收集图绘制中的虚箭线剖断(国外英文资料).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
双代号收集图绘制中的虚箭线剖断(国外英文资料)

双代号网络图绘制中的虚箭线判定(国外英文资料) The virtual arrow line in the double codename network graph is determined by the existence, pointing and number In the drawing of the double codename network diagram, it is often necessary to introduce virtual arrows. But the accurate decision of the virtual arrows is more complicated than the correct drawing. , based on the application of virtual arrow line are summarized on the basis of, respectively, are given by the mapping relationship between requirement and need to introduce and required by the logical relations should be introduced, pointing to the existence of dummy arrow line and the number of criteria. The application of virtual arrows is applied The application of the virtual arrow line in the double codename network diagram can be summarized from the requirements of network logic relation and drawing relation. As shown in figure 1: The virtual arrow line required by the drawing relationship 2.1 drawing relationship requirements Drawing relationship requirement refers to the requirement that a pair of codename can represent only one job during the drawing process of the double codename network diagram. That is to say, there is no such thing as multiple work items in the drawing of the double code network diagram. Can be a number of job sharing a start node (called the node branch node) or sharing a complete node (called a collection for the node), but cant work many share the same start and finish on a node. The virtual arrows line of the drawing relationship is determined Compared with the virtual arrows, which are required by logical relations, the judgment (existence, pointing, and number) of the virtual arrows required by the drawing relationship is simple. Summarized as follows: The criterion of virtual arrows for drawing relationships -- Existence verdict: when n (n = 2) work begins and at the same time, there is a virtual arrow line, i.e. the need to introduce virtual arrows. Pointing to the decision: the virtual arrow lin

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档