- 1、本文档共22页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
养猪场废水计划(厌氧)(国外英文资料)
养猪场废水方案(厌氧)(国外英文资料)
Design of pig farm sewage treatment
Pig farm sewage treatment
Design scheme
Jinan shifang environmental protection co., LTD
Two OO a year in January
Orders to record
The first chapter is about 2
Chapter 2 design data 2
Chapter iii process flow 3
Chapter iv process description 3
Chapter 5. The expected processing effect 5
Chapter 6 design calculation 5
Chapter 7 investment estimate 7
Chapter 8 costs analysis 7
Chapter ix economic benefit analysis 8
Attached: project schedule
Chapter 1
The waste water from pig farm is formed by the washing of fecal water in the process of the pig production, and the displacement is large. The waste water consists mainly of pig urine, partial residue or whole pig manure, feed residue and pig shaper. Its characteristics are related to the structure of the piggery, the method of cleaning the manure, the nutrition of pig feed, digestion, production management and water use. A pig farm has an annual deposit of 10,000 pigs and a daily discharge of about 150 m3. If the waste water is discharged directly into the water, the water will be eutrophicated. In order to protect the environment, it can be used to recycle pig manure.
Chapter ii design data
2.1 water
According to the data provided, the discharge of sewage from pig farms is 150m3 / d.
2.2 water quality
According to the information provided, the design parameters are as follows:
CODcr: 20000mg/L
BOD5:10000mg/L
SS: 8000mg/L
PH: 6.5 to 8.0
2.3 discharge standard
After treatment, the wastewater has been processed to meet the first-class standards of the Peoples Republic of China (gb8978-1996) :
CODcr is less than or less than 100 m g/L
BOD5 is less than 30 m g/L
SS is equal to 70 m g over L
PH: 6-9
The scheme design of the wastewater treatment project of pig farm is designed, which is divided into the two parts of the anaerobic section and the partial parts of the oxygen and oxygen in the forebody of the whole process. The design data of the anaerobic section is listed
文档评论(0)