- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
动力厂合营市政门路(四龙路段)部分输水管道工程装置部分施工计划(国外英文资料)
动力厂配合市政道路(四龙路段)局部输水管道工程安装部分施工方案(国外英文资料)
Construction plan for municipal water piping installation
One, material acceptance and the cloth pipe
1, the handover should be made: the experimental results of pre-delivery, the proof of the preservative materials, the certificate of the pipe and pipe.
2, the transition list of supervision approved by the pipe is adopted.
3, pipes, pipe fittings and equipment shipped to the construction site, want to use soft belt hoisting when unloading, drop spike light put, avoid pipeline collided with each other, into the tank before the steel pipe should be put in the appropriate sandbag towing bracket, or grooved pile of sand or hay, prevent damage to pipeline external corrosion.
The floor where the pipe is kept is flat and fluffy, and no corrosive chemicals are allowed near the site.
5, steel tube in the process of transportation, loading and unloading pipe shaft to set arc bearing, bearing outsourcing snuggie, play the rubber hose steel wire tension, with his coat to prevent steel tube vibration in transit collision.
After the pipe is transported to the scene, the pipe is placed on one side of the groove, and the pipe is rearranged to the desired location in special section. The pipe shall not fall, hit, roll or drag along the ground to prevent injury, distortion and damage to the pipe during handling and handling.
Maintain a certain Angle when the pipe is hoisted to make sure that the pipe deformation is minimal.
8, pipes, pipe fittings and equipment shipped to the scene, must by materials (inspector) by root for the antisepsis and nozzle quality check one by one, and make records, unqualified, are not allowed to be used and transported from the scene.
After the entrance of the pipe, pipe and equipment, a certificate of quality and material shall be available.
2, pipe installation and butt welding
The piping installation shall be carried out in accordance with GB50268 ~ 2001, the construction and acceptance of water discharge pipes
您可能关注的文档
最近下载
- 绵阳南山2025年高中自主招生数学真卷 .pdf VIP
- 学生公寓引进社会化服务安装自助吹风机项目147.docx
- 粤语学习必威体育精装版最全教程.ppt VIP
- 2025上海市六年级升七年级暑假数学衔接讲义 第32讲 图形的运动 暑假综合检测二(解析版)(1).docx VIP
- 压力容器制造质量保证手册+程序文件+表格-符合TSG 07-2019特种设备质量保证管理体系.pdf
- 深海鱼油(syt)课件.ppt
- 《做温暖的教育者》读书分享+课件.pptx VIP
- GB50907-2013 抗爆间室结构设计规范.docx VIP
- 部编版语文一年级上册第八单元教材解读大单元集体备课.pptx VIP
- 大功率充电中压直挂充电技术的发展.pdf VIP
文档评论(0)