动土功课测试题(国外英文资料).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
动土功课测试题(国外英文资料)

动土作业测试题(国外英文资料) 1, fill in the blanks (2 points, 40 points) When removing the solid wall support, it should proceed from the bottom. When the support is replaced, the new one should be installed first and then the old one. 2, in the construction site should be set according to need fence, cover plate, and warning signs, should be hanging red light warning shots at night, after the construction should be timely backfill and compaction, and restore the ground facilities. The excavation of the earth shall be carried out from the top down, and the digging of the bottom of the ground shall not be excavated. 4, normal maintenance of plant and maintenance in operation, the new, change, and expansion project boundary zone in operation, to undertake the project operation unit must do risk assessment, contingency plans, construction plan, construction plan to engineering review and handle the type of rear can construction operations. 5, before the launch, the construction unit should be detailed to carry out the audit opinion and related security measures, in conjunction with the engineering department for all workers safety education and safety technical clarificaiton, before the construction. 6, the engineering department received a construction application, after the launch of a reviewer must look at the construction site, control for drawings, confirm nondestructive hidden underground facilities, not impede the safety of building foundation, can confirm approval. 7, for the boundary of the area in operation, the device work environment confirmed by head device, and put forward the security measures, to the production department, after checking by the engineering department for examination and approval. Two, the choice (two points, 20 points, at least one in each question) Excavating, piling, drilling, digging, earth anchor deep in (B) above; The work of using a bulldozer, a roller, etc., to fill the ground, or to smooth the ground, etc., may have an impact on underground

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档