人防地下室工程裂缝处理计划(国外英文资料).docVIP

人防地下室工程裂缝处理计划(国外英文资料).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
人防地下室工程裂缝处理计划(国外英文资料)

人防地下室工程裂缝处理方案(国外英文资料) Dragon lake bay peoples basement concrete wall and crack repair plan I company of dragon bay (d d about the plot project) civil air defence basement project, completed the main body construction, basement basement outer backfill soil most has been completed; In the basement quality examination, a small amount of stop water screw was found on the wall of the underground wall, and the water was seepage in the root of the individual stop. The negative a layer in the basement in 2013 after the casting of the roof appeared a few not through crack, seeping in sewing parts when it rains, I company project department for meetings to study the causes of cracks and the treatment method for analysis. The formation of a crack 1, check the external walls of the main causes of water seeping in screw, premature template removed after concrete pouring, demolition of concrete strength is too low, when the water stop screw grip of small, as the templates work when dismantle the screw tapping, vibration, create a loose screw inside the concrete part of, eventually lead to water penetration. The main reason for the cracks in the roof of the basement is that the concrete is larger than the water and the concrete shrinks. The plastic film covered by concrete panels is not fixed with other materials, and the wind blows and the soldiers are not able to keep the water in time. After the construction of concrete is finished, it is too early for the upper part of the construction to be piled up. From the cracking time, this part belongs to the early formation of the cracks, and through continuous observation for many times, nearly a month of roof fracture basically stable, no trends continue to expand. The treatment of cracks The strength of concrete meets the design requirement, to ensure the durability of the house, to prevent corrosion of roof steel and to close the cracks. The sealing materials are made of cement slurry (42.5 R early and regular Portland cement, 107

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档