一级建筑测验工程项目治理温习领导(国外英文资料).doc

一级建筑测验工程项目治理温习领导(国外英文资料).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
一级建筑测验工程项目治理温习领导(国外英文资料)

一级建造考试工程项目管理复习指导(国外英文资料) In 2012, project management was a third increment The project is designed to increase the value of the project. The main meaning of construction project general contracting is not that total responsibility and turnkey, its core is through the integration of design and construction organization, promote the tightness combination of design and construction of, to achieve the purpose of value for project construction, most use change price contract. The purpose of information management is to provide value-added services for project construction through the organization and control of effective project information transmission. Three platforms Project management planning is a programmatic document guiding the project management Quality manual is a programmatic document of enterprise quality management system. The design of the construction organization is a programmatic document that directly instructs the technical activities and management of the on-site construction operation. Nine ways The dynamic settlement of the price of the project: the method of settling the price according to the actual price; To calculate the price difference according to the main material; The method of price adjustment for completion; The method of adjustment formula (dynamic settlement formula); The regulation of price adjustments caused by price fluctuations in standard construction bidding documents. Construction cost control: the expression method of deviation analysis (cross channel diagram, table method, curve method) The basic method of construction cost analysis: comparative method, ratio method, factor analysis method, differential calculation method. The ratio method is divided into the relative ratio law (the output value), the dynamic ratio method (the base period index and the sequential index), and the formation ratio method. Engineering quality statistical method: stratification, factor analysis, permutation and histogram. L hazard identification me

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档