全焊接钢桁梁斜拉桥主梁整节段施工技术.pdfVIP

全焊接钢桁梁斜拉桥主梁整节段施工技术.pdf

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
全焊接钢桁梁斜拉桥主梁整节段施工技术

学兔兔 全焊接钢桁梁斜拉桥主梁整节段施工技术 陈理平 73 文章编号:1003—4722(2010)04—0073—04 全焊接钢桁梁斜拉桥主梁整节段施工技术 陈理平 (中铁大桥局股份有限公司上海分公司,上海 200071) 摘 要:上海闵浦二桥主桥为独塔双索面连续钢板桁组合梁斜拉桥,跨径组合为251.4 m(主 跨)+(147+38.25)m(锚跨),其主梁为全焊接结构,主梁施工采用工厂整节段预制,现场整节段 安装的方法,节段预制在工厂先进行平面桁片拼装,再进行立体总拼,拼装时采用N+1匹配技术, 现场吊装支架段采用1 200 t浮吊安装,标准段采用260 t步履式桥面吊机安装,钢梁节段在工地采 用对接焊接施工。 、 关键词:斜拉桥;钢桁梁;组合梁;焊接;桥梁施工 中图分类号:U448.27;U445.4 文献标志码:A Construction Techniques for Integral Blocks of Main Girder of an All_-Welded Steel Truss Girder Cable--Stayed Bridge CHEN Li—ping (Shanghai Company,China Railway Major Bridge Engineering,Inc.,Shanghai 200071,China) Abstract:The main bridge of the Second Minpu Bridge in Shanghai is a continuous composite steel plate and truss girder cable—stayed bridge with a single pylon and double cable planes and with span arrangement 251.4 m (main span)4-(147+38.25)m (anchor spans).The main girder of the bridge is an all—welded structure that was constructed by the method of manufacturing each integral truss block in shop and installing the block in field.At the time each block was manufac— tured in shop,the plane trusses were firstly assembled and then the space trusses were generally assembled,for which the N+1 matching technique was used.In field,the sections of the truss girder used as the lifting and installation supports were installed by the 1 200一t capacity floating crane,the standard sections of the girder were installed by the 260一t capacity walking type deck crane and al1 truss blocks were connected by but

文档评论(0)

haihang2017 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档