- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
彼得拉斯:中国过去现在与未来
彼得拉斯中国的过去现在与未来 詹姆斯?彼得拉斯 李冬梅 摘译 of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspe
您可能关注的文档
最近下载
- 中外建筑史幻灯片.ppt VIP
- 河北高速公路集团有限公司招聘笔试题库2024.pdf
- 《景观规划设计》课件——乡村景观园林庭院设计.pptx VIP
- 风力发电设备加工项目投资计划书(参考).docx
- 人教版高中地理必修第一册第一章:宇宙中的地球大单元整体教学设计2024.docx
- 工程造价软件应用 课件 第2章 广联达BIM土建计量平台应用.pptx
- 特色校本教材——魔幻数学(一年级).docx VIP
- 2025一建《建筑工程管理与实务》考前6套模拟卷.docx VIP
- 工程勘察服务成本要素信息(2022版).pdf VIP
- 2024年秋季学期新人教版七年级上册英语课件 Unit 1 You and Me (第4课时) Section B 1a-1d.pptx VIP
文档评论(0)