- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
heatingstorage
Heating or pressure compensation—pre-heating improve inlet temperature Heating storage sys for multi-tepm Air to Air heating recovery picture Air to Air heating recovery picture high efficient Air to Air heating recovery curveout let T 60 80 Degree C Test result Conclusion Promise With the help of Air to Air heating recovery SyS: We can reduce your heating cost 40-60% Replace diesel fuel ,running cost is only 25-30% of before; Replace LPG or LNG, cost will be 45-60% of before; Replace directly electric heating : for the day time shift8:00-22:00,cost will be 25-30%, for the 24 Hrs running shifts, cost will be 30-35% of before; Method of selecting of product Our Heating out put Must bigger litter bit than customer consumption Normally 10-20% is. That is mean 1.1-1.2 times bigger. Some function of our product Pre-Heating can divided 3 period Heating release can be 6 period Priority Temp out let or in let (water:0~95 ℃,oil:0~300 ℃ ±1 ℃ Safty Note Sys must connected to open system to air; No pressure in the pip, only cycle pump pressure. Product must connect to the Ground. Must connect to expansion tank. Transformer only can working on 85-90% of full rating plate. Oil sys in the Temp rise between 95~105℃,must pause, till no water inside, then to 230-250 pause again, till hydrocarbon vapor released, After that we can rise Temp to the setting T. Installation site request Need drainage oil water storage sys to prevent leaking Heating storage module are very heavy, need special base to support machine—9T on 1.2x2.4m Multi-modules must installed on ground or basement. Because we can unassembled to the parts. The entry door of the site can be very small or narrow. 1.0x2.0 minimum Front of machine need 2.0m, back side need 1.0 maintenance space, and two side need 1.0 meter walking space. On the top need 2.0 meters to install wire. Thanks very much 谢谢大家! Maojing Why we need off peak power storage Electricity can not be stored middle night Human need
文档评论(0)