Doka d2 Bridge - 16-01-2006.pptVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Doka d2 Bridge - 16-01-2006

[Ersteller/Pfad/Dateiname] [Unternehmen, z.B. Deutsche Doka Schalungstechnik GmbH] [Ersteller/Pfad/Dateiname] DOKA D2 supporting scaffolding system Doka D2 支撑塔架系统 Overview of the presentation Details about D2 system components General details of the formwork used in bridge projects Details of the cantilever formwork Adaptation of the formwork to a bigger box girder Dismantling sequence of cantilever form Lowering stages of the bottom formwork Disassembling of the shoring Reference pictures D2 Supporting Scaffolding System Doka D2 支撑塔架系统 …is used at many bridge job sites world wide 在世界上广泛使用 D2 Supporting Scaffolding System Doka D2 支撑塔架系统 D2 system frames D2 支撑架 D2 system bracing D2 – head and/or foot parts Repositioning of D2 scaffolding 支撑塔架移动系统 D2 stair tower accessories D2 爬梯塔架 General details of the formwork system in bridge projects: DOKA模板工程项目演示 General details of the formwork system in bridge projects: Adaption of the formwork system at superstructure widening Details of the cantilever formwork Situation during casting Details of the cantilever formwork Use of bottom waling and transport rail Details of the cantilever formwork Front elevation showing the part of the shoring with assembled transport rails Dismantling of the cantilever formwork First step: The shoring for the next segment is already erected and the transport rails are assembled Dismantling of the bottom formwork Lowering sequence: Fixing of the chain block to the box girder Transport beams fixed in position Lowering of the bottom panel with chain block panels ready for transport to the next bridge segment Dismantling of the bottom formwork Removal of first bottom unit: The chain block will be fixed to the box girder on existing anchoring holes The bottom panel will be temporary fixed to the box girder by chain block Removal of D2 shoring unit Lowering down of the bottom panel to the ground by chain block Dismantling of the bottom formwork Removal of the remaining bottom p

文档评论(0)

sh4125733 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档