DL300_F_SYS_Dualine-system-startup_SS-R03-11.pdfVIP

  1. 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
  2. 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
  3. 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
DL300_F_SYS_Dualine-system-startup_SS-R03-11.pdf

® Farval Dualine Installation System Start-Up Bulletin DL300 BIJUR DELIMON INTERNATIONAL 2685 Airport Road • Kinston, NC 28504 Tel. 800-227-1063 • Fax: 252-527-9232 website: DC1-1 SECTION DC SYSTEM INSTALLATION AND START UP (For Dualine Automatic Electric Powered and Air Powered Systems) First study the schematic layout, the bearing list, and the applicable Farval publications describing dualine systems. Together they completely describe the system and its component assemblies. They also explain how the system and its component assemblies operate and how the various sub-assemblies-the pump, the reservoir, valve manifolds, and controls should be combined. In addition to becoming well acquainted with the lubricating system, it is often helpful to sketch the location of all manifolds and lube lines on the machine with chalk or crayon. INSTALLATION Pump Reservoir Assembly-Locate where it is protected from dirt and where it can be easily maintained and filled with lubricant. Bolt to a solid foundation (except air powered barrel pumps). Measuring Valves-Mount on a flat surface close to the bearings (within 10 feet) and close to the machine for protection but where accessible for adjusting and servicing. Valves may be mounted in any position but indicator stems should be visible and should face the same direction for easier checking. Mount with indicator stems down if excessive dirt and scale are present or order U-1732 indicator covers. Adjacent valve blocks may be piped together before mounting, using one union in each

文档评论(0)

ganpeid + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档