- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
March 10, 2004 HP Confidential - Copyright ? 2004 HP corporate presentation. All rights reserved. October 2003 Presentation Title Copyright ? 2003 HP corporate presentation. All rights reserved. 太原钢铁(集团)公司信息化建设项目基于消耗的计划模式专题讨论【物料管理】 Aug 03, 2005 In reorder point planning, the available warehouse stock comes from the following calculation: warehouse stock + open purchase order quantity (Purchase orders, firmed planned orders, firmed purchase requisitions). There will be a material shortage if the available warehouse stock is less than the reorder point. The shortage quantity is the difference between the reorder point and the available warehouse stock. The purchase order quantity is created from the lot-sizing procedure in the material master record. The system sets the planning date as the basis for the requirements date. In static lot-sizing procedures, future shortages are not taken into account, that is, if a shortage exists, an order proposal is created for the amount defined for the static lot size. The system does not check to see when a future shortage exists. If you select the lot-for-lot order quantity, an order proposal is created for the shortage quantity. If several issues exist on one day that cannot be covered, the system still only creates one order proposal covering the total shortage quantity on this particular day. If you select the fixed lot size, the system creates an order proposal for the fixed lot size if a material shortage occurs. If this is not sufficient to cover the shortage quantity, then the system creates several order proposals for the same date until the shortage is covered. If you select replenishment up to maximum stock level, when a material shortage occurs, the system creates an order proposal for the amount required to bring the stock level up to the maximum stock level recorded in the material master record. By entering additional restrictions in the material master record, you can influence the grouping together of re
文档评论(0)