B1-F3外框柱柱脚手架施工方案(英文版).pptxVIP

B1-F3外框柱柱脚手架施工方案(英文版).pptx

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
;1.General introduction;1.General introduction;1.General introduction;1. Install the erection column with 10.8m length with partial area with beam and deck at 1st upper floor level. 2. Cast two section of the composite column up to 4.8x2=9.6m(strengthen the stability of the column). 3. Install the 2nd section of the erection column 4.5m length. 4. Install the periphery beam @ 2nd Floor level. 5. Install the beam and deck (partial area). 6. The further super structure construction shall wait for the B1 slab or F1 slab completion.;;1.General introduction;250mm;;100mm;200mm;Welding the positioning rebar at the end of profiled steel L20mm,D25mm;;Pull up wire rope;100mm;400mm;Steel tube :1.5”*6m*2mm;600mm;300mm;600mm;;; Positioning and Setting Out ;Steel beam;Method to seal the steel beam opening;4. Column Formwork; Formwork Assembly ;Verticality adjustment: A tripod is set on the outside of the aluminum mold, and the tripod is composed of vertical waler、pull-push prop and horizon prop. The vertical waler is fixed with the horizon waler above the aluminum formwork, and the verticality of the aluminum formwork is adjusted by adjusting the length of the Pull-push prop.;4. Column Formwork;4. Column Formwork; Formwork Assembly ; Checking ;Formwork Dismantle ;1、Variation from plumb. a) In the lines and surfaces of column, piers, walls, and in arises: In any 3 meters of length………………………………………………………………...6mm Maximum for the entire length...…………………………………………………….…..25mm b) For exposed corner columns , control joint grooves, and other conspicuous lines: In any 6 meters of length……………………………………………………….....….….6mm Maximum for the entire length...……………………………………………………......12mm 2、Minimum periods for retain formwork in position before striking shall not be less than 24 hours. 3、Install forms substantially free of surface defects. Caulk forms to prevent leakage. Provide 20mm chamfering at exposed corners. 4、Thoroughly clean forms and adjacent surfaces to r

文档评论(0)

murumulu + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档